Since our return, the house has been our total focus. Mike is on site daily to oversee the crews working there and has begun to clear out some of the landscaping. We spent Christmas Eve making two trips to the dump/landfill to throw out some of our overgrown shrubs and trees.
Last week all of the popcorn ceilings were taken down and the existing tile flooring jack hammered up. The a grinder and sander smoothed out the mastic which the jack hammer did not remove. This week the 2 layers of lino in the kitchen were scraped up and electrical pulled in for ceiling fans in every room. Next week the new electrical runs for the kitchen will be pulled in and I'll have more holes in my walls and ceilings.
Living room with no popcorn ceiling or floor covering, just concrete pad
Yesterday Mike measured out and marked the placement of our cabinets and appliances in the new kitchen. I was finally able to picture it in my mind. We are getting Holace style KraftMaid cabinets in a painted mushroom (light taupe) finish. The left side of the kitchen with the sink will have all glass upper doors and the right side with my new 36 inch Blue Star gas range will have standard wood doors. We will be installing a nice stainless 36 inch range hood and side by side stand alone fridge and freezer so I'll have over 18 cubic feet of fridge and freezer both!!
This is the range side of the kitchen. Higher blue stripe is where bottom of range hood will be placed
Our homeowner's association approved plans for our sunroom addition so we are now just waiting for Pima County to issue our permit. Once we have the permit the footer for the exterior wall can be poured. I am impatient to move in but I want it done right as this will be my forever home. Excited!!